10 Common Construction Risks for Contractors & Owners

By 

Last Updated Apr 24, 2024

Man in hard hat review documents with another man in front of construction equipment.

Construction is a tough, often volatile industry, with one of the highest rates of business failure of any economic sector. While construction can be a lucrative business, it is also high risk. Predicting future risks, and taking steps to mitigate their impact, is critical to the success of any project. While it is impossible to eliminate entirely, identifying common sources of risk is the first step in minimizing loss. Below, we'll explore some of the most common construction risks that can disrupt project schedules, erode profit margins, and drive expensive, lengthy disputes.

Learn more about risk management in construction

Contents

Table of contents

1. Delays

Without a doubt, delays are among the most common risks involved in construction. Pushing back the delivery date on projects affects everyone on the job. Delays can stem from a variety of places, including:

  • Poor project management
  • Permitting & inspections
  • Supply chain disruptions
  • Change orders
  • Accidents
  • Adverse weather

Delays can be caused by activities at any level of the chain, and both in the back office and on the jobsite. As a result, it is critical for owners and general contractors to establish clear communication processes that are easy to use by employees, subcontractors, and vendors alike. The sooner potential delays are identified and communicated to the construction manager, the faster they can take action to avoid or reduce the delay.

2. Documentation errors

According to the Arcadis 2022 Global Construction Disputes Report, the second-highest cause of disputes globally was errors and omissions in contract documents. The increasing size and complexity of commercial and public construction projects, combined with growing cost-saving pressure to speed up construction, creates more potential for errors and omissions in the preconstruction process. Errors in drawings, specifications, and design coordination can lead to increased capital costs and schedule delays.

The risk caused by documentation problems extends well beyond preconstruction. In the Arcadis report, "poorly drafted or incomplete and unsubstantiated claims" was the leading cause of construction disputes in North America in 2021.

Contractors and subs must often meet stringent notice deadlines and submission requirements, whether prescribed by contract or by statute. Documentation errors or missed deadlines can delay payments and even invalidate a contractor's right to file a claim.

The risk of errors is compounded by the sheer volume of documents required to complete a project, including:

What does the submittals process look like in a construction project?

3. Change management

Any material change to the contract after construction begins is a significant risk to owners, contractors, and suppliers alike, because it will affect time, scope of work, materials, and cost. 

When the GC receives an RFI from the owner that directs them to make a material change to the project, it kicks off a waterfall of events down the chain. The GC will issue RFIs to each subcontractor whose work is impacted. 

Ideally, each subcontractor would submit a change order that details the cost and schedule adjustment required, and wait for the owner’s approval before they begin the work. But in the real world, in an effort to avoid or reduce schedule delays, contractors frequently get started on work before it is approved. In this all-too-common scenario, payment disputes between the owner and contractors are a near inevitability. 

Risk prevention around change management begins during preconstruction. The more time and effort spent on investigating site conditions and reviewing drawings and site plans for accuracy, the fewer changes required after breaking ground. During the project, owners and contractors should follow a clear and efficient process for communicating and managing changes, doing everything possible to reduce the time between RFIs and change order approval. 

Contractors can greatly reduce their risk of payment disputes over contract changes by getting an approved change order in hand before beginning the work.

4. Subcontractor default

Subcontractor default is a serious risk, especially on complex projects that require a large number of specialty contractors to complete specialized portions of work. The larger the project, the greater the number of subcontractors on the job. Pressure to accelerate construction often requires trade stacking and tight schedules with a very slim margin for error. When a subcontractor defaults on their contract or otherwise fails to perform, the entire project can be affected, especially if their scope of work falls on the critical path.

What are the warning signs a specialty contractor is in risk of default? In this video, industry veteran Julian Clayton covers the biggest red flags.

5. Supply chain issues

Building material shortages and price escalations can impact schedules, construction costs, and profit margins. Since the COVID-19 pandemic began, the global supply chain has experienced near-continuous setbacks and disruptions, with wide-ranging impacts on construction in progress.

Pricing for lumber and other materials has been volatile. But many contractors have had recent trouble even getting delivery of necessary materials. Supply chain issues aren't always caused by a global pandemic. Cost increases and material shortages can be driven by:

  • Shipping and trucking issues
  • Natural disasters
  • Business closures
  • Spikes in demand
  • Fuel prices
  • Economic recession
  • Strikes and labor disputes

Many construction contracts include an escalation clause to balance risk between the contractor to the owner in the event of price spikes. But construction managers and owners need to keep a close eye on global supply chain developments to monitor the risk of material shortages. A flexible and diversified supply chain is fast becoming essential for construction projects of any size.

6. Poor project management

Poor project management leads to miscommunication, delays, and disputes. When a general contractor or construction manager isn’t clear on what’s expected or does a poor job of scheduling subs, time and materials can go to waste.

Poor project management can cause a ripple effect across other projects as well, increasing the risk for specialty contractors. When a sloppy project management delays a specialty contractor's work, it can disrupt schedules on other jobs and make labor and equipment coordination an impossible task.

7. Labor shortages

Labor presents a construction risk with projects of any size. Finding qualified, reliable employees is a growing challenge for businesses in every industry. There’s always a risk that manpower lined up for a project might fall through.

When a contractor takes on a project and discovers they don’t have the manpower to finish it, it can slow everyone on the job down. Again, this pushes out the timeline and cuts into profitability.

On union projects, the potential for a strike creates additional risk. Solidarity across locals can mean your entire union workforce walks off the project in protest of working conditions on another job beyond your control. 

8. Poorly defined scope of work

It’s hard to keep a project on track when it’s unclear what that track looks like. A poorly defined scope of work is a management issue that can (and usually does) roll downhill. Contractors working under a fixed price or lump sum contract should pay close attention to items like:

  • Site conditions
  • Customer input
  • Materials pricing

These can drive the cost of a project up and profit margins down. However, there are mechanisms to use, like cost-plus contracts for avoiding the effects of a job without a definitive scope. Improving communication on every project level can lead to a better-defined scope and help you stay profitable by avoiding scope creep on your projects.

9. Health and safety hazards

The building industry consistently ranks at the top of the most dangerous industries. The risk of health and safety hazards is a frequent concern for construction businesses, who want to both maintain a healthy workforce and avoid financial loss due to increased workers compensation insurance premiums or penalties from safety violations.

Two prominent health and safety organizations, Occupational Safety & Health Administration (OSHA) and the American Industrial Hygiene Association (AIHA), independently identified their top four health and safety risks in construction.

OSHA Focus Four

  • Falls
  • Caught in or between
  • Struck by
  • Electrocution

AIHA Focus Four

  • Manual material handling
  • Air contaminants
  • High temperatures

Both organizations offer a variety of training and educational resources to support contractor safety programs.

10. Payment disputes

The time to get paid in construction is among the longest of all industries. Slow payments create risk for everyone on a project, at all levels of the chain. Payment problems disrupt contractor cash flow and increase the risk of default. They also increase an owner's risk of lien claims on the property, as contractors and suppliers take action to recover unpaid contractual amounts.

Payment disputes arise frequently due to:

Comprehensive documentation, clear communication, and close adherence to contract requirements are vital for contractors to prove their case if it ends up in court.

Categories:

Risk Management

Written by

Tom Scalisi

57 articles

Tom Scalisi is a writer with over 15 years of experience in the trades. He is passionate about educating contractors and specialty contractors about the best practices in the industry. He has seen first-hand how education, communication, and preparation help construction professionals overcome challenges to build a strong career and thriving business in the industry.

View profile

Explore more helpful resources

article-image

Construction Delay Claims: Learn the Main Types — and Their Defenses

Delays are among the most common disputes that arise on construction projects. However, the process of establishing and proving a delay claim can get complicated. That’s why having a comprehensive...

article-image

Mitigating Subcontractor Risk: Pro Tips for General Contractors

Every construction project comes with unique risks, and assessing and mitigating subcontractor risks is necessary for general contractors (GCs) to maintain profitability and smooth operations. Effectively planning for and managing...

article-image

Just in Time Delivery in Construction: Minimizing Waste, Maximizing Efficiency

Just In Time (JIT) delivery is a foundational method of construction site logistics and inventory management. JIT involves scheduling and procuring materials to be delivered on site as close to...

article-image

Deciphering Construction Drawing Symbols

In construction, every blueprint and drawing is a complex web of information, distilled into symbols and lines that determine the work executed onsite. For those in the field, understanding these...

Procore is committed to advancing the construction industry by improving the lives of people working in construction, driving technology innovation, and building a global community of groundbreakers. Our connected global construction platform unites all stakeholders on a project with unlimited access to support and a business model designed for the construction industry.

LinkedIn Icon
LinkedIn
Facebook icon
Facebook
Twitter icon
Twitter
Instagram Icon
Instagram
YouTube icon
YouTube

Call us at (844) 692-0626 to speak with a product expert.

Apple LogoApple App StoreGoogle Play logoGoogle Play

Downloads

Apple LogoApple App StoreGoogle Play logoGoogle Play
  • Privacy Notice
  • Terms of Service
  • Do Not Sell Personal Information

© 2024 Procore Technologies, Inc.